The kitchen wiring is "done" (all the wires are in but they are not connected to the fuses nor are the switches/plugs on because it is easier to drywall with open boxes and open boxes can't be "hot")
this leaves the outlets and lights in the main part of the room and three exterior lights. Dh would have gotten a lot farther, but he was called in to work second shift on Saturday - at least the overtime will help with the 100ft of wire he says we still need to buy. Also I am grateful that he gets overtime.
He thinks he can finish the wiring next weekend. (Although I think he may have forgotten we have plans with dd2 on Saturday)
besides helping him feed wires this weekend, I found two Pyrex pans to put on the "ask kids" pile and used up some of the stockpiled soap making supplies. (I will be offering soap at my booth at the pottery sale at the end of April - because I have soap dishes and "related items" are allowed.)